Look inside massive Win Chill project

May 8, 2018

Picture a massive refrigerator or freezer, shelves stacked floor to ceiling and accessible by a forklift that can rise more than 42 feet.

That gives a sense of what ha been developed at Foundation Park as Win Chill prepares to open its first 205,000-square-foot phase.

Here’s a look inside the project, which will turn on the cold storage system this week, take two weeks to cool the building down and begin receiving product May 23.

The facility also has railroad access, and product input and output is expected to exceed 3 million pounds per day.

Construction already is starting on the next 125,000-square-foot addition, which will open later this year and be all freezer space.

Win Chill has room at Foundation Park for almost 800,000 square feet of warehouse space.

Want to stay in the know?

Get our free business news delivered to your inbox.



Look inside massive Win Chill project

Picture a massive refrigerator or freezer, shelves stacked floor to ceiling and accessible by a forklift that can rise more than 42 feet. That gives a sense of what has been developed at Foundation Park as Win Chill prepares to open its first 205,000-square-foot phase.

News Tip

Have a business news item to share with us?

Scroll to top